
Constructing the main cables involves stringing individual strands back and forth between anchorages. Bridge strand is looped around a wheel, and sent (via the tramway)
to the other anchorage, where it is anchored and sent back to the other side. Upon completion of the stringing, the separate strands are adjusted, collected, and seized into bundles.

Traveling sheave with bridge strand in tow passing through
blocks at tower (Autumn, 1929)

Reels containing galvanized bridge strand

Wire looped around shoes at anchorages

Collecting strands into bundles

Note finished and unfinished strands

View of spinning machinery, New York anchorage

Eight finished strands in main tower saddle (Spring,
1930)